top of page
FLIT.jpg

FAULT LOOP IMPEDANCE TESTING (FLIT)

FLIT is a part of Verification to ensure efficiency of automatic disconnection of supply, thereby ensuring some amount of safety against electric shock and fire effects (fire) in Low Voltage Electrical Installations.

FLIT is included in the CEA electricity Regulation 2023 as a mandatory test in every electrical installation.
Modern electrical safety standards (including NEC 2023, IS7900, IS732, IS3043 etc) demand verifying the efficiency of automatic disconnection during commissioning and periodically.”

Fees Details:

image.png
Screenshot 2024-07-16 at 5.09.40 PM.png
image.png
bottom of page